{"id":619,"date":"2025-01-24T09:03:14","date_gmt":"2025-01-24T09:03:14","guid":{"rendered":"https:\/\/projects.crisance.com\/KCRM\/factories-abilities\/"},"modified":"2025-06-19T08:52:29","modified_gmt":"2025-06-19T08:52:29","slug":"factories-abilities","status":"publish","type":"page","link":"https:\/\/kcrm-kw.com\/ar\/factories-abilities\/","title":{"rendered":"\u0642\u062f\u0631\u0627\u062a \u0627\u0644\u0645\u0635\u0627\u0646\u0639"},"content":{"rendered":"<h4>Laboratory and quality adjustment:<\/h4>\n<p>6 Laboratory Class A<\/p>\n<p>To keep the highest quality of the supplied concrete, the factory has been equipped with the following:<\/p>\n<div class=\"d-flex\">\n<div class=\"content mb-20\">\n<ul class=\"list-check\">\n<li>Certified &amp; qualified Engineers with good experience to meet all Quality Requirements.<\/li>\n<li>General controller with full knowledge of the site quality management.<\/li>\n<li>Site technicians qualified to handle all the requirement of the supervision in the work site.<\/li>\n<li>Certified laboratory equipment to make the necessary immediate and periodical tests on all raw materials for all concrete types.<\/li>\n<li>Designing all the concrete grades as per client standards &amp; specifications.<\/li>\n<li>All water gauge that has been measured and certified from Ministry of Electricity &amp; Water with Validity Certificates enclosed.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<h5>Raw materials approved sources from Ministries with validity certificates.<\/h5>\n<ul>\n<li>A-Kuwait Cement (OPC \u2013 SRC)<\/li>\n<li>B-Aggregate Lime Stone from UAE (3\/8\u201d \u2013 \u00bd\u201d \u2013 \u00be\u201d)<\/li>\n<li>C-Local Sand (Washed Sand).<\/li>\n<li>D-Minerals and chemicals Additives approved from MPW.<\/li>\n<\/ul>\n<p>Periodic checks are carried out every 6 months for raw materials (cement \u2013 Aggregate \u2013 sand \u2013 additives) and calibrations for Batching Plants by the Governmental Center for Quality Control and Research at the Ministry of Public Works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Laboratory and quality adjustment: 6 Laboratory Class A To keep the highest quality of the supplied concrete, the factory has been equipped with the following: Certified &amp; qualified Engineers with good experience to meet all Quality Requirements. General controller with full knowledge of the site quality management. Site technicians qualified to handle all the requirement [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"factories.php","meta":{"footnotes":""},"class_list":["post-619","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/pages\/619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/comments?post=619"}],"version-history":[{"count":3,"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/pages\/619\/revisions"}],"predecessor-version":[{"id":923,"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/pages\/619\/revisions\/923"}],"wp:attachment":[{"href":"https:\/\/kcrm-kw.com\/ar\/wp-json\/wp\/v2\/media?parent=619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}